DART rail interconnection study, prepared by PBDC, with Wallace Roberts & Todd, LTI Consultants, PRC Engineering, Task 6
Label
DART rail interconnection study, prepared by PBDC, with Wallace Roberts & Todd, LTI Consultants, PRC Engineering, Task 6
Note
Cover title"July 1985.""This document is a draft copy and is subject to revision."
Physical Description
1 v. (various foliations), ill., maps, 29 cm.
System control number
(OCoLC)18219030414739
Provider
Incoming Resources
- Item of1